Risk anaysis & maintanance requirements for foam systems
Train tunnels have specific fire safety requirements. FPC Risk conducted a risk analysis related to the realisation of cross passages and evacuation shafts and the architectural finish of tunnel tubes. We assisted during the design phase of high expansion foams systems and firewater supply systems & set-up of maintenance requirements for foam systems in the tunnel tubes.
Other Infrastructure references